01 49 36 46 20 Inscription gratuite Contact Connexion
appel-offre
appel-offre
 
            
Date de publication : 30/11/2010
Date de péremption : 14/12/2010
Type de procédure : Procédure négociée
Type de document : Avis de marché
ROYAUME-UNI (UK)
appel-offre

Électricité, chauffage, énergie solaire et nucléaire. Turbines éoliennes. Générateurs à turbines éoliennes. Aérogénérateurs. Panneaux solaires. Modules solaires photovoltaïques.

2010/S 232-355505 (Source TED)
 
 
V  E  R  S  I  O  N      F  R  A  N  C  A  I  S  E
TX: AVIS DE MARCHÉ - SECTEURS SPÉCIAUX Travaux
 
 
SECTION I: ENTITÉ ADJUDICATRICE
I.1)NOM, ADRESSES ET POINT(S) DE CONTACT Scottish Water Watermark, Alba Centre, Alba Campus, West Lothian Contact: Procurement & Supply Chain Attn: Avril Thomson/Iain Barclay EH54 7HH Livingston ROYAUME-UNI Téléphone +44 1506678516/694 Courrier électronique (e-mail): ProcurementHelpline@scottishwater.co.uk Fax +44 1506678624 Adresse(s) internet Adresse générale de l'entité adjudicatrice www.scottishwater.co.uk Adresse du profil d'acheteur ProcurementHelpline@scottishwater.co.uk Adresse auprès de laquelle des informations complémentaires peuvent être obtenues: Point(s) de contact susmentionné(s) Adresse auprès de laquelle le cahier des charges et les documents complémentaires (y compris des documents relatifs à un système d'acquisition dynamique) peuvent être obtenus: Point(s) de contact susmentionné(s) Adresse à laquelle les offres ou demandes de participation doivent être envoyées: Point(s) de contact susmentionné(s)
 
 
SECTION II: OBJET DU MARCHÉ
II.1)DESCRIPTION
II.1.6)Classification CPV (Vocabulaire commun pour les marchés publics) 09300000, 31121320, 31121330, 31121300, 09331000, 09331200 Description Électricité, chauffage, énergie solaire et nucléaire. Turbines éoliennes. Générateurs à turbines éoliennes. Aérogénérateurs. Panneaux solaires. Modules solaires photovoltaïques. INFORMATIONS SUR LES LOTS LOT n° 1 INTITULÉ On-site wind turbines - external finance provision
 1)DESCRIPTION SUCCINCTE Scottish Water is one of the largest electricity consumers in Scotland with an annual demand of c. 460 GWH. The business has taken the decision to diversify our energy portfolio with a focus on renewables. Scottish Water requires suitable companies for a number of high reputational value projects to provide: (i) on-site wind turbines to be constructed within the existing Scottish Water property portfolio and (ii) photovoltaic solar panelling construction to provide energy to assets within the Scottish Water asset base. Scottish Water will be an active partner throughout the lifetime of let projects with a focus on delivery to agreed timescales.
 2)CLASSIFICATION CPV (VOCABULAIRE COMMUN POUR LES MARCHÉS PUBLICS) 31121320, 31121330, 31121300
 3)QUANTITÉ OU ÉTENDUE Scottish Water is looking for strategic bidders for this significant opportunity. At present there is no preferred option and all alternatives will be considered. The anticipated options include but are not limited to the following: (i) Cradle to Grave (develop, consent, design, build, finance, operate); (ii) Other options put forward by interested parties. Potential sites will be identified on an ongoing basis and will be offered as individual or as packages of opportunities to successful bidders. It should be noted that in this lot Scottish Water do not intend to provide financial input to the development or capital costs of let schemes however expect to benefit from the energy generated output from let projects. Specific outcomes required from let projects are: (i) The energy created from the windfarms project(s) shall service some or all of the needs of the onsite asset including the capability to integrate safely and securely with existing arrangements; (ii) In instances where surplus energy over and above the needs of the onsite asset(s) is generated by the on site site windfarm, capability to export generated energy by private wire, distribution network or grid will be required. coût estimé hors TVA Fourchetteentre 5 000 000 et 20 000 000 GBP
 4)INDICATION QUANT À UNE AUTRE DURÉE DU MARCHÉ OU À UNE AUTRE DATE DE COMMENCEMENT/D'ACHÈVEMENT Durée en mois: 240 (à compter de la date d'attribution du marché) LOT n° 2 INTITULÉ On-site wind turbines - Scottish Water finance provision
 1)DESCRIPTION SUCCINCTE Scottish Water is one of the largest electricity consumers in Scotland with an annual demand of c. 460 GWH. The business has taken the decision to diversify our energy portfolio with a focus on renewables. Scottish Water requires suitable companies for a number of high reputational value projects to provide: (i) on-site wind turbines to be constructed within the existing Scottish Water property portfolio and (ii) photovoltaic solar panelling construction to provide energy to assets within the Scottish Water asset base. Scottish Water will be an active partner throughout the lifetime of let projects with a focus on delivery to agreed timescales.
 2)CLASSIFICATION CPV (VOCABULAIRE COMMUN POUR LES MARCHÉS PUBLICS) 31121320, 31121330, 31121300
 3)QUANTITÉ OU ÉTENDUE Scottish Water is looking for strategic bidders for this significant opportunity. At present there is no preferred option and all alternatives will be considered. The anticipated options include but are not limited to the following: (i) Cradle to Grave (develop, consent, design, build, operate); (ii) Other options put forward by interested parties. Potential sites will be identified on an ongoing basis and will be offered as individual or as packages of opportunities to successful bidders. Specific outcomes required from let projects are: (i) The energy created from the windfarms project(s) shall service some or all of the needs of the onsite asset including the capability to integrate safely and securely with existing arrangements; (ii) In instances where surplus energy over and above the needs of the onsite asset(s) is generated by the on site site windfarm, capability to export generated energy by private wire, distribution network or grid will be required. Scottish Water may choose to finance these opportunities independently or in partnership with another party(ies). coût estimé hors TVA Fourchetteentre 5 000 000 et 20 000 000 GBP
 4)INDICATION QUANT À UNE AUTRE DURÉE DU MARCHÉ OU À UNE AUTRE DATE DE COMMENCEMENT/D'ACHÈVEMENT Durée en mois: 240 (à compter de la date d'attribution du marché) LOT n° 3 INTITULÉ Photovoltaics - external finance provision
 1)DESCRIPTION SUCCINCTE Scottish Water is one of the largest electricity consumers in Scotland with an annual demand of c. 460GWH. The business has taken the decision to diversify our energy portfolio with a focus on renewables. Scottish Water requires suitable companies for a number of high reputational value projects to provide: (i) on-site wind turbines to be constructed within the existing Scottish Water property portfolio and (ii) photovoltaic solar panelling construction to provide energy to assets within the Scottish Water asset base. Scottish Water will be an active partner throughout the lifetime of let projects with a focus on delivery to agreed timescales.
 2)CLASSIFICATION CPV (VOCABULAIRE COMMUN POUR LES MARCHÉS PUBLICS) 09331000, 09331200
 3)QUANTITÉ OU ÉTENDUE Scottish Water is looking for strategic bidders for this significant opportunity. At present there is no preferred option and all alternatives will be considered. The anticipated options include but are not limited to the following: (i) Cradle to Grave (develop, consent, design, finance, build, operate); (ii) Other options put forward by interested parties. Potential sites will be identified on an ongoing basis and will be offered as individual or as packages of opportunities to successful bidders. It should be noted that in this lot Scottish Water do not intend to provide financial input to the development or capital costs of let schemes however expect to benefit from the energy generated output from let projects. Specific outcomes required from let projects are: (i) The energy created from the solar/PV project(s) shall service some or all of the needs of the onsite asset including the capability to integrate safely and securely with existing arrangements; (ii) In instances where surplus energy over and above the needs of the onsite asset(s) is generated by the on site site solar/pv, capability to export generated energy by private wire, distribution network or grid will be required. coût estimé hors TVA Fourchetteentre 2 000 000 et 10 000 000 GBP
 4)INDICATION QUANT À UNE AUTRE DURÉE DU MARCHÉ OU À UNE AUTRE DATE DE COMMENCEMENT/D'ACHÈVEMENT Durée en mois: 240 (à compter de la date d'attribution du marché) LOT n° 4 INTITULÉ Photovoltaics - Scottish Water finance provision
 1)DESCRIPTION SUCCINCTE Scottish Water is one of the largest electricity consumers in Scotland with an annual demand of c. 460 GWH. The business has taken the decision to diversify our energy portfolio with a focus on renewables. Scottish Water requires suitable companies for a number of high reputational value projects to provide: (i) on-site wind turbines to be constructed within the existing Scottish Water property portfolio and (ii) photovoltaic solar panelling construction to provide energy to assets within the Scottish Water asset base. Scottish Water will be an active partner throughout the lifetime of let projects with a focus on delivery to agreed timescales.
 2)CLASSIFICATION CPV (VOCABULAIRE COMMUN POUR LES MARCHÉS PUBLICS) 09331000, 09331200
 3)QUANTITÉ OU ÉTENDUE Scottish Water is looking for strategic bidders for this significant opportunity. At present there is no preferred option and all alternatives will be considered. The anticipated options include but are not limited to the following: (i) Cradle to Grave (develop, consent, design, build, operate); (ii) Other options put forward by interested parties. Potential sites will be identified on an ongoing basis and will be offered as individual or as packages of opportunities to successful bidders. Specific outcomes required from let projects are: (i) The energy created from the solar/PV project(s) shall service some or all of the needs of the onsite asset including the capability to integrate safely and securely with existing arrangements; (ii) In instances where surplus energy over and above the needs of the onsite asset(s) is generated by the on site site solar/PV, capability to export generated energy by private wire, distribution network or grid will be required. Scottish Water may choose to finance these opportunities independently or in partnership with another party(ies). coût estimé hors TVA Fourchetteentre 2 000 000 et 10 000 000 GBP
 4)INDICATION QUANT À UNE AUTRE DURÉE DU MARCHÉ OU À UNE AUTRE DATE DE COMMENCEMENT/D'ACHÈVEMENT Durée en mois: 240 (à compter de la date d'attribution du marché)
 
 
SECTION IV: PROCÉDURE
IV.3)RENSEIGNEMENTS D'ORDRE ADMINISTRATIF
IV.3.3)Conditions d'obtention du cahier des charges et des documents complémentaires
IV.3.4)Date limite de réception des offres ou des demandes de participation 14.12.2010
IV.3.5)Langue(s) pouvant être utilisée(s) dans l'offre ou la demande de participation anglais.
 
 
C L A S S E    C P V
31121300 - Aérogénérateurs 
31121320 - Turbines éoliennes 
31121330 - Générateurs à turbines éoliennes 

 
            

SERVICES ENTREPRISES
> POUR LES ENTREPRISES
SERVICES ETABLISSEMENTS PUBLICS
> POUR LES ACHETEURS PUBLICS
AIDE / ARCHIVES / RÉSEAU SOCIAUX
> AIDE
> ARCHIVES
RETROUVEZ-NOUS SUR