Inscrivez-vous 01 49 36 46 20
appel-offre
appel-offre
 
            
Date de publication : 12/02/2024
Date de péremption :
Type de procédure : Information absente
Type de document : Avis de préinformation ou avis périodique indicatif utilisé uniquement à titre d’information
Espagne
appel-offre

Espagne - Cuves sous pression - Manufacturing of the Drift Duct for ITER Neutral Beam Injectors

2024/S 2024-087621  (Voir l'avis original TED)
 
 
V  E  R  S  I  O  N      F  R  A  N  C  A  I  S  E
87621-2024 - Planification
Espagne – Cuves sous pression – Manufacturing of the Drift Duct for ITER Neutral Beam Injectors
OJ S 30/2024 12/02/2024
Avis de préinformation ou avis périodique indicatif utilisé uniquement à titre d’information
Fournitures

   1.  Acheteur
1.1.
Acheteur
Nom officiel: The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy")
Forme juridique de l’acheteur: Institution, organe ou agence de l’UE
Activité du pouvoir adjudicateur: Services d’administration générale

   2.  Procédure
2.1.
Procédure
Titre: Manufacturing of the Drift Duct for ITER Neutral Beam Injectors
Description: The procurement of the Heating Neutral Beam (HNB) Drift Ducts (DD) consists in the Drift Duct Bellows and the Drift Duct Liner and is based on a Build-to-Print (BtP). Additional tools necessary for the Factory Acceptance Tests are also part of the procurement and are designed up to built-to-print level by IO. Finally, few equipment (tools, jigs, fixtures, test bench, but also the Mineral Insulated cables) will be designed and delivered by the supplier. The DD parts have been designed and shall be manufactured in accordance with (EN 14917) for the bellows, SDC-IC for the DD Liner (the manufacturing requirements are defined in the Annex B) and RCC-MR 2007 (class 2). The NB DD is classified ITER Quality Class 1 and ITER Safety Class 1, PED Cat I and ESPN Level N3. The main dimensions and weight of the Drift Duct are Diameter: 2900 mm, Length: 1900 mm and Weight:
   6. 7 t. Based on these Build-to-Print specifications, the scope of work of the supplier includes, mainly:
   1.  Manufacturing engineering;
   2.  Procurement;
   3.  Manufacturing, testing and cleaning;
   4.  Factory acceptance testing;
   5.  Packaging and shipment to a Site in the European Union;
   6.  Documentation.
Identifiant interne: F4E-OPE-1578
2.1.1.
Objet
Nature du marché: Fournitures
Nomenclature principale (cpv): 44615000 Cuves sous pression
2.1.4.
Informations générales
Base juridique:
Règlement (UE, Euratom) 2018/1046

   3.  Partie
3.1.
Partie: PAR-0001
Titre: Manufacturing of the Drift Duct for ITER Neutral Beam Injectors
Description: The procurement of the Heating Neutral Beam (HNB) Drift Ducts (DD) consists in the Drift Duct Bellows and the Drift Duct Liner and is based on a Build-to-Print (BtP). Additional tools necessary for the Factory Acceptance Tests are also part of the procurement and are designed up to built-to-print level by IO. Finally, few equipment (tools, jigs, fixtures, test bench, but also the Mineral Insulated cables) will be designed and delivered by the supplier. The DD parts have been designed and shall be manufactured in accordance with (EN 14917) for the bellows, SDC-IC for the DD Liner (the manufacturing requirements are defined in the Annex B) and RCC-MR 2007 (class 2). The NB DD is classified ITER Quality Class 1 and ITER Safety Class 1, PED Cat I and ESPN Level N3. The main dimensions and weight of the Drift Duct are Diameter: 2900 mm, Length: 1900 mm and Weight:
   6. 7 t. Based on these Build-to-Print specifications, the scope of work of the supplier includes, mainly:
   1.  Manufacturing engineering;
   2.  Procurement;
   3.  Manufacturing, testing and cleaning;
   4.  Factory acceptance testing;
   5.  Packaging and shipment to a Site in the European Union;
   6.  Documentation.
Identifiant interne: F4E-OPE-1578
3.1.1.
Objet
Nature du marché: Fournitures
Nomenclature principale (cpv): 44615000 Cuves sous pression
3.1.9.
Informations complémentaires, médiation et réexamen
Organisation chargée des procédures de recours: General Court of the European Union

   8.  Organisations
8.1.
ORG-0001
Nom officiel: The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy")
Numéro d’enregistrement: N01110115D
Adresse postale: C/ Josep Pla 2; Torres Diagonal Litoral, Edificio B3
Ville: Barcelona
Code postal: 08019
Subdivision pays (NUTS): Barcelona (ES511)
Pays: Espagne
Téléphone: 0034 93 320 18 00
Point de terminaison pour l’échange d’informations (URL): https://industryportal.f4e.europa.eu
Rôles de cette organisation:
Acheteur
8.1.
ORG-0002
Nom officiel: General Court of the European Union
Numéro d’enregistrement: EUJC
Adresse postale: Rue du Fort Niedergrünewald
Ville: Luxemburg
Code postal: L-2925
Subdivision pays (NUTS): Luxembourg (LU000)
Pays: Luxembourg
Adresse électronique: GeneralCourt.Registry@curia.europa.eu
Téléphone: +352 4303-1
Adresse internet: http://curia.europa.eu/
Rôles de cette organisation:
Organisation chargée des procédures de recours
11. Informations relatives à l’avis
11.1.
Informations relatives à l’avis
Identifiant/version de l’avis: dfa42e0e-21e6-4874-899e-58b09a7c24b1 - 01
Type de formulaire: Planification
Type d’avis: Avis de préinformation ou avis périodique indicatif utilisé uniquement à titre d’information
Date d’envoi de l’avis: 09/02/2024 10:20:40 (UTC)
Langues dans lesquelles l’avis en question est officiellement disponible: anglais
11.2.
Informations relatives à la publication
Numéro de publication de l’avis: 87621-2024
Numéro de publication au JO S: 30/2024
Date de publication: 12/02/2024
Date prévue de publication d’un avis de marché dans le cadre de la procédure en question: 30/04/2024

 
 
C L A S S E    C P V
44615000 - Cuves sous pression